
AIL Arena
FACTS
AIL Arena Facts
On 28 November 2021, the citizens of Lugano expressed their strong desire for the construction of the new Sports and Events Centre by voting with an approval rate of 56%. The new sports district will see the construction of a new stadium named AIL Arena. The facility will be dedicated exclusively to football and managed solely by FC Lugano.
Construction on the AIL Arena construction site went under way
2023 through 2026
Cruz y Ortiz arquitectos, Sevilla
Giraudi Radczuweit architetti SA, Lugano
HRS Real Estate SA
Aziende Industriali di Lugano (AIL) SA
- Seating only (UEFA matches): 8’093 spectators
- Mixed seating for regular matches (with standing sectors): 8’793 spectators
104
252
20
60
9
CHF 100 millions
CHF 18.4 millions
60
175 (daily average)
Hybrid Turf
SFL ‘A’ and ‘A-PLUS’ category stadium
UEFA category 4 stadium
Photovoltaic system
Green roofs
Accessible areas and sectors for people with disabilities
2 LED video walls each amassing a scope of 116
4 LED side screens of 53 m² each
200 monitors
May 29 through 31, 2026 - more informations coming soon